all necessary permits were obtained and a feasibility study was developed
all financial costs for project development have been optimized
all initial data for the design were collected
you have received the optimal project, which will take into account economic, functional-technological and architectural features and requirements
In recent years, the popularity of pre-fabricated buildings is growing rapidly. This is explained by more affordable and simple technology of erection. In addition, unlike capital construction, the timing in this case is simply fantastically operational. And so those who are going to implement such a project, usually wondering where to start, and what stages it includes.
So, for starters, let's define the concept of what, in fact, fast erect structures are. These are structures, the carrying part of which is made of a metal frame. It is due to this that it is possible to achieve speed and a simpler algorithm for erection. About him and talk.
Although the construction of frame buildings and implies simplicity, it still needs to get permission. To do this, it is necessary to conduct a geological survey to obtain a topographic map of the area in which the structure will be located. This is necessary in order to assess the relief and technogenic conditions of the territory, on the basis of which it is possible to draw conclusions about the prospects and feasibility of construction, as well as to outline the proposed layout. When the results of the examination are ready, a draft of the future structure is drawn up. It takes into account the characteristics of the area and the wishes of the customer. A sketch of the building is drawn up, a concept is being developed. Also at this stage, the strength of metal structures is calculated and their design is done.
Although prefabricated buildings are easy and do not need to build a complex foundation, the ground for them still needs to be prepared. Depending on the characteristics of the terrain, it can be piles, reinforced concrete structures, brick, screed. Then the site is carefully prepared for the installation of structures.
The metal structures prepared in accordance with the project are brought to the place of construction. Their stage-by-stage installation is carried out by assembling individual elements using special fasteners. When the frame is completely ready, workers proceed to the skin, which is produced mainly by sandwich panels. After the internal finishing works, the establishment of communications and other.
Usually about a month passes between the moment of the order for the construction of prefabricated structures and the acceptance of the building. Of course, the period may be less, or vice versa, depending on the area of the proposed structure and the complexity of the work. Our company is engaged in the professional erection of frame structures. Ordering here a prefabricated building, you will receive it in the shortest time and at a bargain price.